5 THINGS A SAN MATEO ADU BUILDER SHOULD SETTLE BEFORE YOU SIGN

ADU Construction / November 24, 2026 / Mendez & Son's Construction

You probably know which accessory dwelling unit you want already. A backyard cottage, a converted garage, a place for a parent or a renter. A straight answer on how one San Mateo bid differs from the next is harder to get, because on paper they look alike: a drawing, a number, a start date.

The differences show up later, at the permit counter and at the first trench. Five things decide most of them, and a good builder can settle every one before you sign. Ask for each.

Schedule a San Mateo ADU Consultation
A detached backyard unit behind a single-family home, with a fenced lawn
A detached backyard unit behind a house. Photo by Zac Gudakov on Unsplash
In Order

THE 5 THINGS TO SETTLE WITH AN ADU BUILDER BEFORE YOU SIGN

  1. 01Which office actually issues your permit
  2. 02What your lot allows, measured on your lot
  3. 03What's underground, and what's in the panel
  4. 04What size you're building, and what that does to the fees
  5. 05How the price is written, and who pays when something turns up
01 The Office

WHICH OFFICE ACTUALLY ISSUES YOUR PERMIT

A San Mateo mailing address doesn't always mean the City of San Mateo reviews your plans. Some neighborhoods with that address sit in unincorporated county land, and the towns next door each run their own planning and building offices. The forms, the fees and the pace change with the office, so look up your parcel with the city and the county yourself, first. Your builder should have done that before the first drawing.

Once the application is complete

Whichever office it turns out to be, California treats an ADU application as a ministerial review. That means no public hearing, and the city has 60 days to act once your application is complete. "Complete" is where the time goes. Each round of correction notes generally adds 2 to 4 weeks, and a full permit cycle on the Peninsula often lands somewhere in the 3 to 6 month range. Our ADU permit timeline guide shows where those weeks go, and our Redwood City ADU post shows how much one neighboring city's counter differs from the state's baseline.

60 DaysFor the city to act once your application is complete
2 to 4 WeeksEach round of correction notes, generally
3 to 6 MonthsA full permit cycle on the Peninsula, often
02 The Lot

WHAT YOUR LOT ALLOWS, MEASURED ON YOUR LOT

The Rules

San Mateo lots come in several shapes: the plain rectangle, the corner lot, the hillside parcel. The state caps side and rear setbacks at 4 feet, so that part is settled. The rest depends on the city's zoning and on the state exemptions the city applies to your lot: how far a detached unit has to sit from the house, how tall it can be, whether parking comes with it. Those are the rules that change from one city to the next, and they're the ones that send a design back for a redo.

The Ground

A few things on the ground can overrule the rules above. A recorded easement, or a sewer line crossing the yard, can rule out the spot you had in mind. A slope changes the foundation and the path to the door. A corner lot adds a street side to account for, and the fire department wants a clear route to the new unit. None of it shows up on a listing photo. It shows up when somebody measures.

Our setback guide for ADUs covers how those numbers work across Bay Area cities, and the city's own ADU and JADU handout is where the current San Mateo numbers live.

03 The Utilities

WHAT'S UNDERGROUND, AND WHAT'S IN THE PANEL

A new unit needs water, sewer and power, and the lines it ties into were laid for the house as it was. San Mateo's own zoning code treats the two common cases differently. A unit converted inside an existing structure, like a garage, pays no connection fee or capacity charge, while a separate new unit is charged one in proportion to its burden on the system. So a garage conversion and a backyard cottage differ in more than construction cost.

Two items are worth checking before the contract.

The Sewer Lateral

The first is the sewer lateral, the pipe that runs from the house to the street. A camera run through it costs little next to the discovery that it's cracked or undersized once the trench is open.

The Electrical Panel

The second is the electrical panel. Plenty of older homes still have a panel that can't carry a second dwelling on top of the house, and a bigger panel or a new service means a request to PG&E, whose schedule isn't the builder's. That request belongs in the design phase, not after the framing is up.

$10,000 to $50,000

Utility work is a line many budgets leave out. On the jobs we price, connections often fall somewhere between $10,000 and $50,000, depending on distance, depth and what the old lines can carry. The utility hookup cost breakdown shows what drives that range.

04 The Size

WHAT SIZE YOU'RE BUILDING, AND WHAT THAT DOES TO THE FEES

Size changes the fee bill in steps. Under California law, an ADU of 750 square feet or less pays no impact fees, and San Mateo's code says the same. Above that, the city charges fees in proportion to the size of the main house. A newer state rule also exempts units under 500 square feet from school impact fees. So a unit a few square feet over 750 can carry charges that a slightly smaller one doesn't. Check that number before the design is final, not when the invoice arrives.

Size also narrows the type. A junior ADU (a JADU, capped at 500 square feet) is carved out of the existing house. A garage conversion reuses a footprint you already own, and a detached unit gives the most room and the most privacy and brings the most site work.

Under 500 sq ftNo school impact fees
750 sq ft or lessNo impact fees
Over 750 sq ftFees in proportion to the size of the main house
05 The Price

HOW THE PRICE IS WRITTEN, AND WHO PAYS WHEN SOMETHING TURNS UP

Two bids at the same number can promise different things. A lump sum hides where the change orders will come from, and a line item can't. Ask for the bid broken out so the foundation, the engineer, the utility work, the permit and fees, and the finish allowances each sit on their own line. For a line-by-line read of a bid, see what to look for in a construction proposal.

Many San Mateo homes are decades old, and old homes hold things behind the walls and under the yard that nobody can see yet. A common planning figure for that on an older home is a contingency of 15 to 20 percent, against the 5 percent many bids carry. The question to put to any builder isn't whether something will turn up. Who pays when it does? The answer belongs on a page of the contract.

A Good Answer

A good answer looks like this. Before signing, Dan walks the property with the homeowner and names the risks he can see. On a Redwood City job, that walk showed moisture damage, and he told the homeowner there was more behind that wall. He didn't write a clean contract that pretended otherwise. He talked through what was likely back there, gave a rough number as a contingency, and only then signed for the visible scope. Once the wall was opened, the actual repair cost less than the contingency he had named. The homeowner had decided what to fund before signing, so the repair was a flagged risk and not a surprise.

One Step for Each

THE SHORT LIST FOR SIGNING DAY

  1. 1The office. Ask which office will review your plans, and ask the builder to show you where your parcel sits on the city's or the county's map.
  2. 2The lot. Ask for a site plan with the setbacks, easements and slope measured on your lot, before any design work starts.
  3. 3The utilities. Ask whether the sewer lateral has been scoped and the panel checked, and when the PG&E request goes in.
  4. 4The size. Ask for the plan priced two ways, as drawn and trimmed under the next fee threshold, with the fees on their own lines.
  5. 5The price. Ask for line items, a number for what can't be seen yet, and the contract's words on who pays when something turns up.
Weighing a Unit in San Mateo

IT STARTS WITH A WALK OF THE LOT AND THE HOUSE

We walk the lot and the house before we put a number on an ADU, and that walk is where these five get answered. Anything we flag and you choose not to fund is yours. If we overlooked something we should have spotted, we cover every dollar of it. If you're weighing a unit in San Mateo, our San Mateo ADU construction page explains how we run it and how to set one up.

San Mateo ADU Construction Schedule a San Mateo ADU Consultation

For ADU construction and garage conversions in San Mateo and across the San Francisco Bay Area, visit https://mendezandsonsinc.com.

Read reviews of our ADU contractor on the Peninsula team on Yelp.