Portfolio

ADU CONSTRUCTION
& REMODELING
PROJECTS

Every project here involved permitting, engineering coordination, and structured construction management. From detached ADUs to full interior renovations, each was completed through our design-build process - one team managing planning, permits, and execution.

Conditions varied by city - setbacks, zoning interpretation, inspection sequences, utility tie-ins - but the approach remained consistent: preparation first, then construction.

Start Your Project
01 - Recent Work

FEATURED
PROJECTS

ADU construction, kitchen and bathroom remodels, garage conversions, and whole-home renovations completed across the Bay Area. Each one managed from the first walk-through through final inspection, with the price set at signing and the books open the whole way through.

Detached ADU Under Construction

Detached ADU - Livermore

A standalone rear-yard ADU going up on its own foundation in Livermore. Independent framing, a full kitchen, bath, and laundry, with utility tie-ins and meter coordination, built to Title 24. Tracked line by line in Buildertrend from the slab on up.

  • Independent foundation & framing
  • Full kitchen, bath & laundry
  • Utility tie-ins & meter coordination
Kitchen Remodel

Kitchen Remodel - Carmel

We reworked the layout and opened the kitchen into the living space. New cabinetry, counters, and backsplash, with the trades sequenced so the room came together clean. The whole job was priced up front, before a single cabinet came out.

  • Layout reconfiguration
  • Cabinetry, counters & backsplash
  • Opened to the living space
Whole House Remodel

Whole-Home Remodel - Oakland

A full interior remodel in Oakland, with the kitchen, bath, and laundry rebuilt from the inside out. One team ran planning, permits, and the trades, with the price set at signing and the books open the whole way through.

  • Kitchen, bath & laundry rebuilt
  • Full interior finishes
  • One team, start to finish
Bathroom Remodel

Bathroom Remodel

A full bath taken to the studs and rebuilt: waterproofing, tile, a double vanity in marble, new fixtures and lighting, and a new floor. Most of the work that matters lives behind the walls, where you can't see it, and that's where we spend the time.

  • Taken to the studs
  • Waterproofing & tile
  • Double vanity, fixtures & lighting
Garage Conversion

Garage Conversion - Fremont

A two-car garage turned into finished, livable space. Slab and foundation brought up to spec, framing and fire-rated separation added, walls finished, and the floor sealed in epoxy. Permitted and inspected as a conversion.

  • Slab & foundation upgrades
  • Framing & fire-rated separation
  • Finished walls & sealed floor
03 - Where We Work

PROJECTS
ACROSS
THE BAY

We complete projects throughout the Peninsula, South Bay, and East Bay. Each city has distinct permitting requirements, zoning interpretation, and inspection processes.

Local familiarity reduces revision cycles and keeps timelines on track. All Areas We Serve

Palo Alto Mountain View San Mateo Walnut Creek Redwood City Peninsula South Bay East Bay

START YOUR
PROJECT

Schedule a consultation and we’ll review your property, outline constraints, and define next steps. Feasibility and zoning are confirmed before design investment begins.

Clear scope · Clear plan · Clear expectations

Schedule Your Consultation Today