A detached ADU sits across the yard from your house. An attached one shares a wall with it, so the new unit's kitchen might back up to your den and its bedroom to yours. Homeowners pick this type for good reasons: a narrow lot, a yard they'd like to keep, a parent or a grown kid they want close by.
The shared wall also changes the project more than most people expect. You're not only building a new home, you're making a change to the one you live in, and the five things below all come from that.
(A quick distinction, since a JADU and an attached ADU get mixed up. A JADU is carved out of rooms you already have, and it tops out at 500 square feet. An attached ADU is an addition: a full second home built onto the side or back of the one you have.)
The wall between the two homes does more than hold up a ceiling. It usually has to be built as a fire-rated wall, with layers of drywall specified for the job and the pipes, wires and ducts that pass through it sealed. It also has to keep sound down, which matters when one side is your living room and the other is somebody's bedroom.
Both get settled on paper, before anyone swings a hammer. Which rooms touch the shared wall decides where the noise goes: a closet or a bathroom on your side and a bedroom on theirs is quieter than a TV room against a sleeping room. And if you want a door between the two homes, it generally has to be a rated door in a rated wall, which is a choice to make while the layout is still a drawing.
Where the addition meets the house, the two structures have to work as one building. The new foundation ties into the old one. The new roof joins the existing roofline. An engineer checks that the weight of both has a path down to the ground, and that the new walls and the old walls brace each other in an earthquake, because they won't move the same way if the ground does.
On a drawing, that's a new wall standing next to an old one. On site, the old wall has settled over the decades and rarely sits exactly where the plans say it does, so the engineer and the builder work from measurements of the house as it stands today. That's why a tie-in is the part of an attached unit that looks simplest on paper and takes the most care in the field.
Attaching a unit means opening part of the house: the siding and sheathing on the wall where the addition will join, and sometimes the framing behind them. What's back there is whatever earlier builders left. Dry rot along the bottom of the wall, say. Old wiring. A patched spot where a previous owner joined on an earlier addition. In an older house, lead paint or asbestos. Most of it doesn't show until the wall is open, and none of it is a reason to skip the project. It is a reason to look before you sign.
Looking is what the pre-contract walk-through is for. We go through the house inside and out, including the attic and the crawlspace where we can get into them, and the wall that's about to open gets close attention. If the house is older, lead and asbestos testing get planned instead of discovered. Then, before you sign, we go over what we saw with you, including what the opened wall is likely to show.
We give you a rough budget number up front for the parts nobody can see until the wall is open, and a final number for those parts once it is. You see all of that, then you choose what the budget covers and what it leaves out. Our page on how we run a job follows the work from that first walk to the final inspection.
An attached unit usually sits near the house's plumbing, electrical panel and gas meter, so the runs are shorter than out to a backyard unit. Shorter isn't the same as simple. The questions are whether your panel can carry a second home's worth of load (often the answer is a new subpanel, sometimes a bigger electrical service), whether the sewer line out to the street has room for the added fixtures, and whether the gas line is sized for another set of appliances.
Those get answered in design. When they wait until later, a finished unit can sit there with no power while the utility company finishes its own service upgrade. Our ADU construction timeline post shows where the electrical service request fits in the schedule.
The unit takes up yard, and each city sets its own rules for how much and how close. The City of Pleasanton's ADU handout, dated May 2026, shows how specific those rules get. There, an attached ADU is limited to 50 percent of the house's floor area, though a unit up to 850 square feet (studio or one bedroom) or 1,000 square feet (two bedrooms or more) is still allowed. Setbacks depend on size too: a unit under 800 square feet can sit 4 feet from the side and rear property lines, and a larger one follows the main house's setbacks and floor area limits. The same handout requires fire sprinklers in the new unit when the main house has them.
That's one city. Palo Alto, San Mateo and Walnut Creek each have their own numbers, so the first measurement worth taking is your own lot against your own city's rules. After that, the permit set has to show the tie-ins and the fire separation clearly, and mark which parts are the new unit and which are the existing house. Plan check tends to look hardest at exactly those details, and our ADU permitting page covers how that review works. A permit for an ADU commonly takes 3 to 6 months, depending on the city and how many correction rounds it sends back.
Take these to every builder you talk to, in this order:
The attached ADUs we build start the same way whether the house is in Pleasanton in the Tri-Valley, Mountain View in the South Bay or San Mateo on the Peninsula: with a walk of the house and the lot. To set up that walk for your house, tell us about the attached ADU you have in mind.